Skip to content

About us

An institute that does its own calculations and design

Alliance-Project LLC — an expert in designing hazardous production and technologically complex facilities of Russia’s oil, gas & energy sector. Today we are 60+ specialists in two cities: Tyumen and Saratov.

Positioning

An expert in designing hazardous production and technologically complex facilities of Russia’s oil, gas & energy sector

Principles
  • Continuity
  • Partnership
  • Digitalisation
  • Technological strength
  • Modernity
  • Flexibility
Slogan

Energy and Intelligence

History

2019–2025

Today the team numbers 60+ specialists.

  1. 2019

    Design & survey department

    A design and survey department was formed within PromAlliance.

  2. 2020

    Volume above forecast

    The actual workload exceeded the plan — confirming the need for in-house design competence.

  3. 2021

    Alliance-Project LLC

    An independent legal entity was established. The beginning of our own scope of responsibility.

  4. 2022

    Two cities

    A permanent staff was formed. A digital infrastructure was built that unites Tyumen and Saratov in a single workflow.

  5. 2023

    Environmental review and standards

    First state environmental expert review passed on our own. Internal design standards introduced. Team of 20.

  6. 2024

    Project office in Tyumen

    Formation of the project office in Tyumen. The first surveys performed in-house.

  7. 2025

    Growth

    Direct contracts signed with leading Russian oil and gas producers, internal project management standards developed into a system, internal certification of specialists launched, a workforce workload monitoring system, purchase of all-terrain survey vehicles.

Approach

One responsibility for the entire scope

Designers, surveyors, calculations and document production are all in-house. This is how we guarantee a positive outcome.

Two cities, one process

Digital infrastructure links Tyumen and Saratov into a single production chain.

Documentation as a product

A document set must be readable by the client and by the expert. This is a demand on quality, not on “formatting”.

Direct contracts

We work directly with clients — with the institute bearing direct responsibility.

Principles

Six pillars

  • 01

    Continuity

    We preserve our engineering school and carry solutions from facility to facility — without losing context.

  • 02

    Partnership

    We work as an extension of the client’s team: direct contracts, a clear rhythm, shared responsibility for the expert review.

  • 03

    Digitalisation

    A shared digital environment for two cities: models, documents, schedule and release control in one system.

  • 04

    Technological strength

    Process modelling, BIM/3D and calculation software are part of the design process, not an add-on.

  • 05

    Modernity

    We keep up to date with the requirements of environmental, non-state and industrial safety expert reviews.

  • 06

    Flexibility

    We build the set of sections and the schedule around the facility rather than forcing the facility into a template.

Structure

Organisational structure

Design in two cities, our own surveys, a project management office and a business management centre.

Tyumen · Saratov · 3 departments and a project management office · 15 production sectors · business management centre

Yaroslav K. Blinkov

General Director

Maxim K. Krylov

Technical Director

Tyumen

Integrated Design Department

Head of the Integrated Design Department

  • Process sector

    ТХТКРГС

    Head of sector

  • Site plan and roads sector

    ПЗУSurveyАД

    Head of sector

  • Power engineering sector

    ЭСЭМЭОЭН

    Head of sector

  • Environmental sector

    ОВОСООССЗЗКЭР

    Head of sector

  • Cost estimating sector

    Head of sector

Saratov

Integrated Design Department

Head of the Integrated Design Department

  • Process sector

    ТХТКРГС

    Head of sector

  • Site plan and roads sector

    ПЗУSurveyАД

    Head of sector

  • Power engineering sector

    ЭСЭМЭОЭН

    Head of sector

  • Low-voltage systems sector

    АСУТПКИПиАПССС

    Head of sector

  • Construction sector

    АСКРПОС

    Head of sector

  • Special sections sector

    ПБГО и ЧСТБЭetc.

    Head of sector

Project Management Office

PM / chief project engineers

Project managers are chief project engineers.

Integrated Survey Department

Head of the Integrated Survey Department

  • Geotechnical survey sector

    Head of sector

  • Environmental survey sector

    Head of sector

  • Geodetic survey sector

    Head of sector

  • Hydrometeorological survey sector

    Head of sector

Business Management Centre

  • Finance sector

    Head of sector

  • Legal sector

    Head of sector

  • HR sector

    Head of sector

  • Commercial sector

    Head

  • Administration and facilities sector

    Executive assistant

  • Accounting

    Head of sector

Sections per the org chart: ТХ, ТКР, ГС, ПЗУ, Survey, АД, ЭС, ЭМ, ЭО, ЭН, ОВОС, ООС, СЗЗ, КЭР, АСУТП, КИПиА, ПС, СС, АС, КР, ПОС, ПБ, ГО и ЧС, ТБЭ; surveys — geotechnical, environmental, geodetic, hydrometeorological. Hover over or tap an abbreviation to see what it stands for.

Team

Who does the projects

Our own staff of designers, surveyors and chief project engineers.

60+

specialists · Tyumen and Saratov

  • Chief project engineers

    Project management office: project managers are chief project engineers.

  • Integrated design

    Integrated design departments in Tyumen and Saratov — from process to cost estimates.

  • Our own surveyors

    Integrated survey department: drilling rigs, static cone penetration, geophysics and our own field vehicles.

  • Business Management Centre

    Finance, legal, HR, commercial, administration and accounting — all in-house.

Design sections per the organisational structure

  • ТХ
  • ТКР
  • ГС
  • ПЗУ
  • Survey
  • АД
  • ЭС
  • ЭМ
  • ЭО
  • ЭН
  • ОВОС
  • ООС
  • СЗЗ
  • КЭР
  • АСУТП
  • КИПиА
  • ПС
  • СС
  • АС
  • КР
  • ПОС
  • ПБ
  • ГО и ЧС
  • ТБЭ
  • cost estimates

Engineering surveys

  • geotechnical
  • environmental
  • geodetic
  • hydrometeorological

Our own equipment

Facilities and equipment

We carry out field work with our own people and equipment: drilling, off-road access and an autonomous camp on site.

drilling rigs
6
drilling rigs
m — drilling depth
50
m — drilling depth
all-terrain vehicles, including snowmobiles
6
all-terrain vehicles, including snowmobiles
beds in the field camp
8
beds in the field camp
plotter format
A0+
plotter format
software suites
10
software suites

Drilling rigs

  • UBGM-1M×1
  • T2 on a TROM-8 base×1
  • BBU-001-001 compact self-propelled drilling rig×1
  • UBShM 1-20 drilling rigwith a set of augers, 15.5 kW×1
  • UBShM-1-13 compact rigauger and core drilling, 9.45 kW×1
  • KM-10 drilling rigauger, up to 10 m×1
  • Geologist’s hand drilling kit—

The hand drilling kit is not counted among the drilling rigs.

Field soil testing

  • Static cone penetration rigfield soil testing by static cone penetration

Geophysics

  • Vertical electrical sounding (VES)
  • Potential difference measurementdetection of stray currents
  • Soil electrical resistivity measurementassessment of soil corrosivity to steel
  • Seismic microzoning
  • Thermometric stringsmeasuring soil temperature, including permafrost

Engineering geophysical investigations as part of engineering geological surveys.

All-terrain and swamp vehicles

  • Trom 8amphibious all-terrain vehicle on low-pressure tyres×1
  • SGT-31payload up to 6.5 t×1
  • TINGER Compact 500tracked amphibian×1
  • TREKOL4×4, payload up to 450 kg×1
  • Buran snowmobiles×2

Vehicles and trailers

  • UAZ vehiclesfour-wheel drive 4×4×4
  • Cargo trailerspayload 484–800 kg×3

Field camp

  • Mobile cabinself-contained accommodation for a crew of 8×1

Field instruments

  • Garmin GPSmap satellite navigators
  • Midland radio set
  • SEBA KTM pipe and cable locator kit
  • Abris TM-8 pipe and cable locator kit
  • Testo 540 lux meter
  • Insta360 X3 panoramic cameras

Geodesy and scanning

  • Geodetic and high-precision laser equipment
  • 3D scanners
  • Unmanned aerial vehicles

Office and IT

  • Our own servers
  • Single digital design environmentTyumen and Saratov, secure remote access
  • Canon PlotWave wide-format plottersA0+ format
  • Licensed softwarecalculation, graphics and cost estimating suites — list below

Software

  • Potentsial software
  • Aspen HYSYS
  • KOMPAS-3D
  • AutoCAD
  • Revit
  • SCAD Office
  • LIRA-SAPR
  • GRAND-Smeta
  • MS Office (incl. Project)
  • 1C: Accounting

Per the list of material and technical capabilities (form 8), October 2026; geodetic and laser equipment, 3D scanners, UAVs, geophysical equipment and a static cone penetration rig — per company data, without quantities. Partnerships with environmental and soil laboratories.

Management

Yaroslav K. Blinkov

General Director

Discuss a project

Maxim K. Krylov

Technical Director

Discuss a project

We do not publish staff portraits on the site. To reach the institute, use the phone and email on the alliance-project.ooo domain.