Reference list
The company’s portfolio includes more than 75 contracts; the reference list shows the 48 most notable ones since 2021: technical re-equipment of operating hazardous facilities, reconstruction, new construction and field development, designer’s supervision and calculations. Statuses as of 22.10.2026, per the reference list dated 12.05.2026.
The PDF is in Russian, as the company's official document.
- contracts in the portfolio
- 75+
- the 48 most notable are in the reference list
- clients
- 16
- end clients
- general contracting
- 85%
- 41 of 48 reference list contracts
- re-equipment projects
- 22
- operating hazardous facilities
- years of experience
- 4+
- since December 2021 · 4 yrs 10 mo
- in progress
- 15
- contracts now
- claims
- 0
- from clients
By year
Bar — how many contracts were active in the year.
2021
2 active during the year
2022
10 active during the year
2023
15 active during the year
2024
20 active during the year
2025
27 active during the year
2026
15 active during the year
- 8 — at the expert review stage
- 3 — designer’s supervision
- 1 — detailed documentation
- 1 — engineering surveys
- 2 — design documentation
All items
Showing 49 of 49 items
2021–2022
completedTechnical re-equipment of the control and emergency shutdown systems of a gas treatment facility
- Re-equipment
- GTU
- Process control and ESD
2021–2022
completedTechnical re-equipment of fire protection systems of a gas field
- Re-equipment
- Fire suppression and warning
2022
completedWell facilities and utility corridor
- Re-equipment
- New construction and field development
- Wells and well pads
- Pipelines and product pipelines
2022–2023
Technical re-equipment of a field pipeline
- Re-equipment
- Pipelines and product pipelines
Subcontractor
Western Siberia
2022
completedHydrocarbon gathering and treatment facility
- New construction and field development
- Oil treatment units, central gathering points, gathering points
General contractor
Urals–Volga region
2022–2023
completedTechnical re-equipment of an oil treatment facility
- Re-equipment
- Oil treatment units, central gathering points, gathering points
General contractor
Urals–Volga region
2022–2023
completedHydrocarbon gathering and treatment facility
- Oil treatment units, central gathering points, gathering points
Subcontractor
Western Siberia
2022–2023
completedDesigner’s supervision: field development
- Designer’s supervision
- New construction and field development
- GTU
- Pipelines and product pipelines
Subcontractor
Urals–Volga region
2022–2026
Production base of an operating company: design and detailed documentation
- New construction and field development
- Production base
2022–2023
completed on scheduleField compressor station
- New construction and field development
- BCS
- Pipelines and product pipelines
2023
completedOil field development: well tie-in
- New construction and field development
- Wells and well pads
- Pipelines and product pipelines
General contractor
Urals–Volga region
2023–2024
completedOil field development: well tie-in
- New construction and field development
- Wells and well pads
- Pipelines and product pipelines
General contractor
Urals–Volga region
2023
completedOil field development: well tie-in
- New construction and field development
- Wells and well pads
- Pipelines and product pipelines
General contractor
Urals–Volga region
2023–2024
completedTechnical re-equipment of a gas treatment unit tank farm
- Re-equipment
- Tank farms
- GTU
2025–2026
in progressDesigner’s supervision: technical re-equipment of a tank farm
- Designer’s supervision
- Re-equipment
- Tank farms
- GTU
General contractor
Far East
2023–2024
completed on scheduleTechnical re-equipment of a field communication system
- Re-equipment
- Contact
General contractor
Western Siberia
2023
completed on scheduleHydraulic calculations of gas pipelines
- Calculations
- Pipelines and product pipelines
General contractor
Far East
2023–2026
in progressTechnical re-equipment of fire protection systems of a gas treatment facility
- Re-equipment
- Fire suppression and warning
- GTU
General contractor
Western Siberia
2023–2024
completed on scheduleReconstruction of a tank farm
- Reconstruction
- Tank farms
General contractor
Case: Reconstruction of a tank farm2023–2024
completed on scheduleTechnical re-equipment of an oil treatment facility
- Re-equipment
- Oil treatment units, central gathering points, gathering points
2024–2025
completed on scheduleReconstruction of warning systems at field facilities
- Reconstruction
- Fire suppression and warning
General contractor
Western Siberia
2024–2025
completed on scheduleReconstruction of warning systems at field facilities
- Reconstruction
- Fire suppression and warning
General contractor
Western Siberia
2024–2025
completed on scheduleTechnical re-equipment of field power grid facilities
- Re-equipment
- Power and substations
General contractor
Western Siberia
2024
completed on scheduleTechnical re-equipment of a gas treatment facility
- Re-equipment
- GTU
2025–2026
in progressEngineering and designer’s supervision: technical re-equipment of a gas treatment facility
- Designer’s supervision
- Re-equipment
- GTU
General contractor
Western Siberia
2024–2025
completed on scheduleTechnical re-equipment of a gas treatment facility
- Re-equipment
- GTU
- BCS
General contractor
Western Siberia
2024
completed on scheduleAssociated gas power facility: detailed and cost documentation
- Detailed documentation only
- Associated gas utilisation
2024
completed on scheduleAssociated gas power facility: technical solutions for electricity metering
- Associated gas utilisation
- Power and substations
2024–2026
Development of a subsoil block
- New construction and field development
General contractor
Western Siberia
2024–2026
Hydrocarbon gathering and treatment facility
- New construction and field development
- Oil treatment units, central gathering points, gathering points
General contractor
Urals–Volga region
2024
completed on scheduleWell suspension projects
- Suspension
- Wells and well pads
2024–2025
completed on scheduleAssociated gas utilisation facility: pre-design, design and survey work
- New construction and field development
- Associated gas utilisation
General contractor
Western Siberia
2024–2025
completed on scheduleLiquid hydrocarbon rail tank car loading complex: pre-design, design and survey work
- New construction and field development
- Loading and transport of liquid hydrocarbons
General contractor
2025
completed on scheduleTechnical re-equipment of a gas treatment facility
- Re-equipment
- GTU
- Pipelines and product pipelines
General contractor
Western Siberia
2024–2025
completed on scheduleTechnical re-equipment of a field product pipeline
- Re-equipment
- Pipelines and product pipelines
- Loading and transport of liquid hydrocarbons
General contractor
Western Siberia
2025
completed on scheduleTechnical re-equipment of a gas treatment facility
- Re-equipment
- GTU
General contractor
2025–2026
in progressDesigner’s supervision: technical re-equipment of a gas treatment facility
- Designer’s supervision
- Re-equipment
- GTU
General contractor
2025–2026
in progressWater intake structure for an industrial facility
- New construction and field development
- Water intake
General contractor
Western Siberia
2024–2025
completed on scheduleReplacement of field gas pipeline sections: detailed documentation
- Detailed documentation only
- Pipelines and product pipelines
General contractor
Western Siberia
2025–2026
in progressReconstruction of a gas treatment unit tank farm
- Reconstruction
- Tank farms
- GTU
General contractor
Far East
2025–2026
in progressRevision of surveys and design documentation for the state environmental expert review
- Revision for state environmental review
- Wells and well pads
General contractor
Urals–Volga region
2025–2026
completed on scheduleTechnical re-equipment of a field product pipeline
- Re-equipment
- Pipelines and product pipelines
- Loading and transport of liquid hydrocarbons
General contractor
Western Siberia
2025–2026
completed on scheduleTechnical re-equipment of an oil treatment facility
- Re-equipment
- Oil treatment units, central gathering points, gathering points
General contractor
Western Siberia
2025
completed on scheduleTechnical re-equipment of a gas treatment facility
- Re-equipment
- GTU
General contractor
Far East
2025–2026
in progressTechnical re-equipment of an oil metering station
- Re-equipment
- Metering stations
General contractor
2025–2026
completed on scheduleTechnical re-equipment of an oil treatment facility
- Re-equipment
- Oil treatment units, central gathering points, gathering points
General contractor
Western Siberia
2025–2026
Technical re-equipment of a field pipeline
- Re-equipment
- Wells and well pads
- Pipelines and product pipelines
General contractor
Western Siberia
2025–2026
Construction of a pumping station at a field
- New construction and field development
- Tank farms
- Pipelines and product pipelines
General contractor
Far East
2026
in progressTechnical re-equipment of a gas treatment facility
- Re-equipment
General contractor
Far East
“Completed on schedule” means the contract term expired before the reference list date, the item is not among current contracts, and there are no claims. Items without a status are shown by period only. Names of clients, fields and facilities are not published: the facility type, scope of work, macro-region and years are shown.