Reference list

The company’s portfolio includes more than 75 contracts; the reference list shows the 48 most notable ones since 2021: technical re-equipment of operating hazardous facilities, reconstruction, new construction and field development, designer’s supervision and calculations. Statuses as of 22.10.2026, per the reference list dated 12.05.2026.

Download the reference list (PDF, in Russian)

The PDF is in Russian, as the company's official document.

contracts in the portfolio
75+
the 48 most notable are in the reference list
clients
16
end clients
general contracting
85%
41 of 48 reference list contracts
re-equipment projects
22
operating hazardous facilities
years of experience
4+
since December 2021 · 4 yrs 10 mo
in progress
15
contracts now
claims
0
from clients

By year

Bar — how many contracts were active in the year.

  1. 2021

    2 active during the year

  2. 2022

    10 active during the year

  3. 2023

    15 active during the year

  4. 2024

    20 active during the year

  5. 2025

    27 active during the year

  6. 2026

    15 active during the year

    • 8 — at the expert review stage
    • 3 — designer’s supervision
    • 1 — detailed documentation
    • 1 — engineering surveys
    • 2 — design documentation

All items

Showing 49 of 49 items

  • 2021–2022

    completed

    Technical re-equipment of the control and emergency shutdown systems of a gas treatment facility

    • Re-equipment
    • GTU
    • Process control and ESD
  • 2021–2022

    completed

    Technical re-equipment of fire protection systems of a gas field

    • Re-equipment
    • Fire suppression and warning
  • 2022

    completed

    Well facilities and utility corridor

    • Re-equipment
    • New construction and field development
    • Wells and well pads
    • Pipelines and product pipelines
  • 2022–2023

    Technical re-equipment of a field pipeline

    • Re-equipment
    • Pipelines and product pipelines

    Subcontractor

    Western Siberia

  • 2022

    completed

    Hydrocarbon gathering and treatment facility

    • New construction and field development
    • Oil treatment units, central gathering points, gathering points

    General contractor

    Urals–Volga region

  • 2022–2023

    completed

    Technical re-equipment of an oil treatment facility

    • Re-equipment
    • Oil treatment units, central gathering points, gathering points

    General contractor

    Urals–Volga region

  • 2022–2023

    completed

    Hydrocarbon gathering and treatment facility

    • Oil treatment units, central gathering points, gathering points

    Subcontractor

    Western Siberia

  • 2022–2023

    completed

    Designer’s supervision: field development

    • Designer’s supervision
    • New construction and field development
    • GTU
    • Pipelines and product pipelines

    Subcontractor

    Urals–Volga region

  • 2022–2026

    Production base of an operating company: design and detailed documentation

    • New construction and field development
    • Production base
  • 2022–2023

    completed on schedule

    Field compressor station

    • New construction and field development
    • BCS
    • Pipelines and product pipelines

    Subcontractor

    Urals–Volga region

    Case: Field compressor station
  • 2023

    completed

    Oil field development: well tie-in

    • New construction and field development
    • Wells and well pads
    • Pipelines and product pipelines

    General contractor

    Urals–Volga region

  • 2023–2024

    completed

    Oil field development: well tie-in

    • New construction and field development
    • Wells and well pads
    • Pipelines and product pipelines

    General contractor

    Urals–Volga region

  • 2023

    completed

    Oil field development: well tie-in

    • New construction and field development
    • Wells and well pads
    • Pipelines and product pipelines

    General contractor

    Urals–Volga region

  • 2023–2024

    completed

    Technical re-equipment of a gas treatment unit tank farm

    • Re-equipment
    • Tank farms
    • GTU
  • 2025–2026

    in progress

    Designer’s supervision: technical re-equipment of a tank farm

    • Designer’s supervision
    • Re-equipment
    • Tank farms
    • GTU

    General contractor

    Far East

  • 2023–2024

    completed on schedule

    Technical re-equipment of a field communication system

    • Re-equipment
    • Contact

    General contractor

    Western Siberia

  • 2023

    completed on schedule

    Hydraulic calculations of gas pipelines

    • Calculations
    • Pipelines and product pipelines

    General contractor

    Far East

  • 2023–2026

    in progress

    Technical re-equipment of fire protection systems of a gas treatment facility

    • Re-equipment
    • Fire suppression and warning
    • GTU

    General contractor

    Western Siberia

  • 2023–2024

    completed on schedule

    Reconstruction of a tank farm

    • Reconstruction
    • Tank farms
  • 2023–2024

    completed on schedule

    Technical re-equipment of an oil treatment facility

    • Re-equipment
    • Oil treatment units, central gathering points, gathering points
  • 2024–2025

    completed on schedule

    Reconstruction of warning systems at field facilities

    • Reconstruction
    • Fire suppression and warning

    General contractor

    Western Siberia

  • 2024–2025

    completed on schedule

    Reconstruction of warning systems at field facilities

    • Reconstruction
    • Fire suppression and warning

    General contractor

    Western Siberia

  • 2024–2025

    completed on schedule

    Technical re-equipment of field power grid facilities

    • Re-equipment
    • Power and substations

    General contractor

    Western Siberia

  • 2024

    completed on schedule

    Technical re-equipment of a gas treatment facility

    • Re-equipment
    • GTU
  • 2025–2026

    in progress

    Engineering and designer’s supervision: technical re-equipment of a gas treatment facility

    • Designer’s supervision
    • Re-equipment
    • GTU

    General contractor

    Western Siberia

  • 2024–2025

    completed on schedule

    Technical re-equipment of a gas treatment facility

    • Re-equipment
    • GTU
    • BCS

    General contractor

    Western Siberia

  • 2024

    completed on schedule

    Associated gas power facility: detailed and cost documentation

    • Detailed documentation only
    • Associated gas utilisation

    General contractor

    Western Siberia

    Case: Associated gas power facility
  • 2024

    completed on schedule

    Associated gas power facility: technical solutions for electricity metering

    • Associated gas utilisation
    • Power and substations

    General contractor

    Western Siberia

    Case: Associated gas power facility
  • 2024–2026

    Development of a subsoil block

    • New construction and field development

    General contractor

    Western Siberia

  • 2024–2026

    Hydrocarbon gathering and treatment facility

    • New construction and field development
    • Oil treatment units, central gathering points, gathering points

    General contractor

    Urals–Volga region

  • 2024

    completed on schedule

    Well suspension projects

    • Suspension
    • Wells and well pads

    General contractor

    Urals–Volga region

    Case: Well suspension project
  • 2024–2025

    completed on schedule

    Associated gas utilisation facility: pre-design, design and survey work

    • New construction and field development
    • Associated gas utilisation

    General contractor

    Western Siberia

  • 2024–2025

    completed on schedule

    Liquid hydrocarbon rail tank car loading complex: pre-design, design and survey work

    • New construction and field development
    • Loading and transport of liquid hydrocarbons

    General contractor

  • 2025

    completed on schedule

    Technical re-equipment of a gas treatment facility

    • Re-equipment
    • GTU
    • Pipelines and product pipelines

    General contractor

    Western Siberia

  • 2024–2025

    completed on schedule

    Technical re-equipment of a field product pipeline

    • Re-equipment
    • Pipelines and product pipelines
    • Loading and transport of liquid hydrocarbons

    General contractor

    Western Siberia

  • 2025

    completed on schedule

    Technical re-equipment of a gas treatment facility

    • Re-equipment
    • GTU

    General contractor

  • 2025–2026

    in progress

    Designer’s supervision: technical re-equipment of a gas treatment facility

    • Designer’s supervision
    • Re-equipment
    • GTU

    General contractor

  • 2025–2026

    in progress

    Water intake structure for an industrial facility

    • New construction and field development
    • Water intake

    General contractor

    Western Siberia

  • 2024–2025

    completed on schedule

    Replacement of field gas pipeline sections: detailed documentation

    • Detailed documentation only
    • Pipelines and product pipelines

    General contractor

    Western Siberia

  • 2025–2026

    in progress

    Reconstruction of a gas treatment unit tank farm

    • Reconstruction
    • Tank farms
    • GTU

    General contractor

    Far East

  • 2025–2026

    in progress

    Revision of surveys and design documentation for the state environmental expert review

    • Revision for state environmental review
    • Wells and well pads

    General contractor

    Urals–Volga region

  • 2025–2026

    completed on schedule

    Technical re-equipment of a field product pipeline

    • Re-equipment
    • Pipelines and product pipelines
    • Loading and transport of liquid hydrocarbons

    General contractor

    Western Siberia

  • 2025–2026

    completed on schedule

    Technical re-equipment of an oil treatment facility

    • Re-equipment
    • Oil treatment units, central gathering points, gathering points

    General contractor

    Western Siberia

  • 2025

    completed on schedule

    Technical re-equipment of a gas treatment facility

    • Re-equipment
    • GTU

    General contractor

    Far East

  • 2025–2026

    in progress

    Technical re-equipment of an oil metering station

    • Re-equipment
    • Metering stations

    General contractor

  • 2025–2026

    completed on schedule

    Technical re-equipment of an oil treatment facility

    • Re-equipment
    • Oil treatment units, central gathering points, gathering points

    General contractor

    Western Siberia

  • 2025–2026

    Technical re-equipment of a field pipeline

    • Re-equipment
    • Wells and well pads
    • Pipelines and product pipelines

    General contractor

    Western Siberia

  • 2025–2026

    Construction of a pumping station at a field

    • New construction and field development
    • Tank farms
    • Pipelines and product pipelines

    General contractor

    Far East

  • 2026

    in progress

    Technical re-equipment of a gas treatment facility

    • Re-equipment

    General contractor

    Far East

“Completed on schedule” means the contract term expired before the reference list date, the item is not among current contracts, and there are no claims. Items without a status are shown by period only. Names of clients, fields and facilities are not published: the facility type, scope of work, macro-region and years are shown.