Hazardous production and technologically complex oil, gas & energy facilities — from concept to a document set ready for expert review.
- GTU
- BCS
- CSU
- MRU
- LNG
- LPG
- OTU
Scope of work
- GTU — gas treatment units
- BCS — booster compressor stations
- CSU — condensate separation units
- MRU — methanol regeneration units
- LNG — liquefied natural gas facilities
- LPG — liquefied petroleum gas facilities
- OTU — oil treatment units
- Preliminary water knockout and oil gathering sites
- Pipelines
- Tanks and tank farms
- Well pads
Task
A new booster compressor station at a field, with equipment from a foreign supplier.
Solution
We translated the foreign design documentation and designed a 4 → 8 MPa condensate pumping station and a 3.5 MW stand-alone gas-engine power plant synchronised with the central grid.
Result
438 million Nm³/year booster compressor station — new construction within technical re-equipment.
Field compressor station
- booster compressor station capacity — new construction within technical re-equipment
- 438 million Nm³/year
- unique condensate pumping station
- 4 → 8 MPa
Re-equipment of a gas treatment unit tank farm
- reagent tank farm capacity
- 4,000 m³
- Feasibility study with cost engineering and implementation options