We take on complex facilities, guide them through expert reviews and support construction

Operating hazardous production facilities, hydrogen sulphide and abnormally high formation pressure, −57 °C during surveys, non-metallic pipelines where there were almost no standards. Our own designers, surveyors and special machinery — 60+ specialists in Tyumen and Saratov.

positive conclusions of non-state, industrial safety and state environmental expert reviews
48
of clients come back to us with new projects
92%
of client “reconstruction” requests are actually re-equipment
80%

Figures from our facilities

Every figure comes from one of the institute’s projects; the project is named under the figure

  • 438million Nm³/year

    Booster compressor station — new construction within re-equipment

    Field compressor station

  • 4 → 8MPa

    unique condensate pumping station

    Field compressor station

  • 3,5MW

    an autonomous power complex based on gas piston units

    Field compressor station

  • 1+bn ₽

    estimated cost of the facility, BIM

    Production base of an operating company

  • 4 / 7tanks

    new tanks replacing existing ones — with greater storage capacity

    Reconstruction of a tank farm

  • +16,5%

    to storage capacity after reconstruction

    Reconstruction of a tank farm

  • 19 800m³

    total tank farm capacity

    Reconstruction of a tank farm

  • 4000m³

    reagent tank farm

    Re-equipment of a gas treatment unit tank farm

  • 100%

    APG utilisation

    Associated gas power facility

  • 4options

    of well design considered

    Well suspension project

  • 2800signals

    Process control system: DCS and ESD

    Re-equipment of the process control system of a gas treatment facility

  • 1720sets

    of drawings for the process control system upgrade

    Re-equipment of the process control system of a gas treatment facility

  • 5km

    of new pipe racks

    Re-equipment of the process control system of a gas treatment facility

  • 4HPF

    united by a single fire suppression system

    Unified fire suppression system of a gas field

  • 39km

    of cabling for the single fire suppression system

    Unified fire suppression system of a gas field

Signature expertise

Re-equipment instead of reconstruction

80%

of cases: the client calls it reconstruction, but it is actually technical re-equipment

How the work is classified determines the scope of documentation, the expert review and the timeline. We start with a pre-design survey and technical solutions (OTR) — and isolate what is genuinely re-equipment of a hazardous production facility.

“Type of work” test · 6 outcomes

5–8 questions

Is there an already built and operating facility where the work is planned?

  • New construction
  • Reconstruction
  • HPF technical re-equipment
  • Major overhaul
  • Routine repair
  • Modernisation

A decision tree based on Art. 1 of the Town Planning Code and 116-FZ: the result is the type of work with a reference to the article, the scope of documentation, the expert review and whether a construction permit is needed.

A preliminary guide; the final decision follows the pre-design survey.

Flagship expertise

Non-metallic RTP pipelines

Reinforced thermoplastic pipes instead of steel on field pipelines — where there were almost no standards. We went from the first request to Rostekhnadzor to the Far North.

  1. 2017

    First opening

    The FNP “Rules for safe operation of in-field pipelines” (Rostekhnadzor Order No. 515) opened the way for non-metallic pipes.

  2. 2020

    Expansion

    The FNP “Safety rules in the oil and gas industry” (Rostekhnadzor Order No. 534) broadened the use of non-metallic pipelines.

  3. 2021

    Western Siberia · DN80

    Field pipelines at well pads. There was almost no experience of the technology in Russia, and the client had serious doubts. We sent a request to the central office of Rostekhnadzor and received a positive answer: the expert review was passed and the work completed. At the client’s request, together with the manufacturers, we developed a strength and stability calculation method and a maintenance method.

  4. 2021

    ГОСТ Р 59834-2021

    Russian manufacturers developed a standard for flexible reinforced polymer pipes for field pipelines: up to 35 MPa, up to 95 °C, DN 32–200.

  5. Today

    Far North · DN200

    Design documentation for the development of a subsoil block in the Far North: RTP pipelines of the maximum diameter DN200, made in Russia to GOST R 59834-2021.

Why not steel: corrosion, long installation, weld inspection, electrochemical protection — and lead times for corrosion-resistant pipes can be 1–2 years.

Where we work

Harsh conditions

Frost, permafrost, hydrogen sulphide, remote autonomous sites and live production that cannot be stopped.

  • Harsh climatic conditions

    Pre-design survey

    • At extremely low temperatures (−57 °C)
    • In the mountains
    • On the Arctic Ocean coast
    • In a remote settlement in northern Yakutia

    Re-equipment of a gas treatment facility

  • 78%

    Facilities in the permafrost zone

    Share of 2024 facilities located in permafrost areas.

    2024 facilities · log

  • H₂S > 6%

    Abnormally high formation pressure and hydrogen sulphide, Class II HPF

    Suspension of wells with abnormally high formation pressure; treatment of the kill fluid with a corrosion inhibitor and an H₂S scavenger.

    Well suspension project

  • Autonomy

    Surveys under autonomous conditions

    Engineering surveys for switching an oil well to gas production.

    Switching an oil well to gas production

  • No shutdown

    Installation without production shutdown

    The construction organisation plan provides for installing a nitrogen unit at an operating gas treatment unit without stopping production.

    Re-equipment of a gas treatment facility

  • Tight

    Cramped conditions of an operating plant

    Separator site of a preliminary oil treatment unit at an operating plant: piping of process equipment designed around the specifics of the facility.

    Re-equipment of an oil treatment facility

Competencies

Task → solution → result

Seven areas — each backed by a real project with figures.

01

Design

Hazardous production and technologically complex oil, gas & energy facilities — from concept to a document set ready for expert review.

  • GTU
  • BCS
  • CSU
  • MRU
  • LNG
  • LPG
  • OTU
Scope of work
  • GTU — gas treatment units
  • BCS — booster compressor stations
  • CSU — condensate separation units
  • MRU — methanol regeneration units
  • LNG — liquefied natural gas facilities
  • LPG — liquefied petroleum gas facilities
  • OTU — oil treatment units
  • Preliminary water knockout and oil gathering sites
  • Pipelines
  • Tanks and tank farms
  • Well pads

02

Surveys

Our own integrated engineering survey department — input data never lives apart from the project.

  • Geodetic
  • Geological
  • Environmental
  • Hydromet
  • Geophysical
  • Cultural heritage
Scope of work
  • Engineering geodetic surveys
  • Engineering geological surveys
  • Engineering environmental surveys
  • Engineering hydrometeorological surveys
  • Engineering geophysical investigations (as part of engineering geological surveys)
  • Historical and cultural surveys
  • Historical and cultural heritage review
  • Socio-economic surveys
  • Geodetic and laser equipment, 3D scanners, UAVs
  • Own drilling rigs — drilling depth up to 50 m
  • Field soil testing by static cone penetration
  • Geophysics: vertical electrical sounding, stray current measurement, soil electrical resistivity (corrosivity), seismic microzoning, soil thermometry including permafrost
  • Field instruments: GPS navigators, pipe and cable locators, panoramic cameras
  1. Task

    Input data for switching an oil well to gas production — on a site under autonomous conditions.

  2. Solution

    Our own integrated engineering survey department, our own vehicle fleet and mobile drilling rigs, static cone penetration, engineering geophysics, geodetic and laser equipment, 3D scanners, UAVs.

  3. Result

    Surveys, technical solutions and documentation in one workflow; after the technical solutions stage the project was split into re-equipment and new construction.

03

Expert reviews

We take the documentation through every review without which a facility cannot proceed to construction.

  • State expert review
  • State environmental review
  • Non-state review
  • Industrial safety review
  • SanPiN
  • Rosprirodnadzor
  • Rostekhnadzor
  • EMERCOM
Scope of work
  • GGE — state town-planning expert review
  • GEE — state environmental expert review
  • NGE — non-state expert review
  • EPB — industrial safety expert review
  • SanPiN
  • RPN — Rosprirodnadzor (environmental regulator)
  • RTN — Rostekhnadzor (industrial safety regulator)
  • EMERCOM
  1. Task

    A facility with an estimated cost of over 1 billion roubles — the “full circle” of departmental expert review and environmental approvals.

  2. Solution

    Calculation and approval of the permissible discharge standard, public health risk assessment, calculation of damage to fisheries and approval by the Federal Agency for Fishery.

  3. Result

    48 positive conclusions of non-state, industrial safety and state environmental expert reviews — the institute’s track record.

04

Re-equipment and reconstruction of hazardous facilities

We work with operating hazardous facilities: not from scratch, but in the cramped conditions of live production.

  • HPF
  • 116-ФЗ
  • 384-ФЗ
  • 123-ФЗ
Scope of work
  • Technical re-equipment of hazardous production facilities
  • Reconstruction of operating facilities
  • Documentation in line with 116-FZ, 384-FZ, 123-FZ
  1. Task

    Bring the process control system (DCS and ESD) of a gas treatment facility into line with current industrial safety rules — after Western suppliers left in 2022.

  2. Solution

    Analysis of the domestic equipment market: manufacturers’ workload, delivery times, cost, compatibility with existing Western equipment. We proposed replacing all imported equipment with domestic equipment.

  3. Result

    2,800 signals designed, 1,720 drawing sets, 5 km of new pipe racks.

05

Modelling and BIM

We calculate processes before they reach the drawings and produce documentation from the model.

  • Process modelling
  • BIM
  • 3D
Scope of work
  • Process flow modelling
  • Verification and design calculations
  • 3D models of facilities and the site plan
  • Clash-free coordination of disciplines before the site
  • Documentation produced from the model
  1. Task

    Increase the tank farm capacity without unbalancing the gas treatment unit.

  2. Solution

    An updated P&ID with corrected material and heat balance of the unit; a 3D information model of the production base facility.

  3. Result

    The main detailed documentation sets for the tender were issued on the basis of the agreed technical solutions even before the design documentation stage.

06

Land management

Land allocation for the designed facility — in one workflow with surveys and design.

  • Planning projects
  • Plot plans
  • Cadastre
Scope of work
  • Territory planning and land surveying projects
  • Urban planning plans of land plots (GPZU)
  • Design documentation for forest plots, forest development projects
  • Cadastral works
  • Registration of easements
  • Organisation and holding of public hearings
  1. Task

    Secure land for the designed facility.

  2. Solution

    Territory planning and land surveying projects, urban planning plans, forest plot design documentation and forest development projects, cadastral works, easements, public hearings.

  3. Result

    The land part is prepared by the same institute that carries out the surveys and design.

07

Adapting foreign technical solutions

For equipment manufacturers from China and other countries: we bring solutions into line with Russian codes and take them through expert review.

  • GB ↔ GOST
  • TR CU (EAEU)
  • ФНП
  • Industrial safety review
  • 中文
More about the service
Scope of work
  • Gap analysis: GB, ASME, API ↔ GOST, SP, FNP
  • Recalculations: strength, loads, climatic design, seismic
  • Design and detailed documentation under Russian rules
  • Translation of design documentation — in-house technical Chinese translators
  • Expert review and HPF safety justification
  • Designer’s supervision and support through commissioning
  1. Task

    A booster compressor station from a Chinese manufacturer had to be integrated into a Russian project and taken through expert reviews.

  2. Solution

    Our own translators translated the design documentation; we adapted the solutions to Russian codes and produced the documentation under Russian rules.

  3. Result

    The expert reviews were passed successfully; the station became part of the technical re-equipment project.

Approach

How we work

Process

  1. 01

    Dynamic project route maps

  2. 02

    3D information modelling (BIM)

  3. 03

    Level 3 resource planning

  4. 04

    Internal quality control service

People

60+specialists · Tyumen and Saratov

  • Our own staff of designers
  • Staff members certified by Rostekhnadzor as industrial safety experts
  • Internal training and professional development centre

Digital environment

A0+plotter format for document production

  • A single digital collaborative design environment for Tyumen and Saratov with secure remote access
  • Our own servers
  • A0+ wide-format plotters
  • Licensed software

Field

50m — drilling depth with our own rigs

  • 6 drilling rigs, drilling depth up to 50 m
  • 4 all-terrain and swamp vehicles, 2 snowmobiles, 4 4×4 vehicles
  • Mobile cabin: a field camp for 8 people
  • Geodetic and high-precision laser equipment, 3D scanners, unmanned aerial vehicles
  • Static cone penetration rig for field soil testing
  • Geophysics: vertical electrical sounding, stray currents, soil electrical resistivity, seismic microzoning, soil thermometry
  • GPS navigators, radios, pipe and cable locators, panoramic cameras
  • Partnerships with environmental and soil laboratories

Software

  • Potentsial software
  • Aspen HYSYS
  • KOMPAS-3D
  • AutoCAD
  • Revit
  • SCAD Office
  • LIRA-SAPR
  • GRAND-Smeta
  • MS Office (incl. Project)
  • 1C: Accounting
All facilities and equipment →

Partner · PromAlliance LLC

Turnkey approvals together with PromAlliance

An expert company in industrial and fire safety from which our design department grew in 2019. Special technical documentation — when codes deviate, are insufficient or absent.

  • STU
  • HPF safety justifications
  • Fire risk calculations
  • Scientific and technical support
  • Industrial safety review
  • Industrial safety declarations
  • Non-state review
  • Support through state environmental and state town-planning reviews

PromAlliance LLC figures

special technical conditions developed and fire risk assessments performed
150
project implementation costs saved
≈30%
fire risk calculations received conclusions from the State Fire Academy and VNIIPO of EMERCOM of Russia
20+
HPF safety justifications developed and industrial safety expert reviews performed
100+
FNP “violations” examined
50+

Partner figures from the corporate magazine; these are not results of Alliance-Project LLC.

Regulatory framework

Safety at every stage

Facilities must comply with technical regulations. Our work rests on three federal laws: 384-FZ, 123-FZ and 116-FZ — safety of buildings and structures, fire safety and industrial safety.

384-ФЗ

Safety of buildings and structures

123-ФЗ

Fire safety

116-ФЗ

Industrial safety of hazardous production facilities