Completed project

Reconstruction of a tank farm

Reconstruction of a tank farm

  • Reconstruction
tanks — phased installation of new tanks to replace existing ones
4 instead of 7
to storage capacity after reconstruction
+16,5 %
total tank farm capacity
up to 19,800 m³

Per the reference list

Reference list
Role · period
General contractor · 2023–2024 · completed on schedule

Scope of work

  1. 01Input data collection and pre-design survey
  2. 02Integrated engineering surveys
  3. 03Development of design and detailed documentation
  4. 04HPF safety justification
  5. 05Organisation of and support through non-state and industrial safety expert reviews

Highlights

  • Phased installation of 4 tanks to replace 7 existing ones, increasing storage capacity by 16.5%
  • Total tank farm capacity — up to 19,800 m³
  • Definition of construction phases
  • Purchase specifications, data sheets and the main detailed documentation sets for tenders — based on the agreed technical solutions before the design documentation stage
  • An updated P&ID with corrected material and heat balance of the gas treatment unit
  • Nitrogen blanketing solution