Completed project
Reconstruction of a tank farm
Reconstruction of a tank farm
- Reconstruction
- tanks — phased installation of new tanks to replace existing ones
- 4 instead of 7
- to storage capacity after reconstruction
- +16,5 %
- total tank farm capacity
- up to 19,800 m³
Per the reference list
Reference list- Role · period
- General contractor · 2023–2024 · completed on schedule
Scope of work
- 01Input data collection and pre-design survey
- 02Integrated engineering surveys
- 03Development of design and detailed documentation
- 04HPF safety justification
- 05Organisation of and support through non-state and industrial safety expert reviews
Highlights
- Phased installation of 4 tanks to replace 7 existing ones, increasing storage capacity by 16.5%
- Total tank farm capacity — up to 19,800 m³
- Definition of construction phases
- Purchase specifications, data sheets and the main detailed documentation sets for tenders — based on the agreed technical solutions before the design documentation stage
- An updated P&ID with corrected material and heat balance of the gas treatment unit
- Nitrogen blanketing solution