Completed project · Western Siberia
Associated gas power facility
Associated gas power facility: detailed and cost documentation
- Power
- APG utilisation
- 100%
- technical solutions for electricity metering
- AMR
Per the reference list
Reference list- Role · period
- General contractor · 2024 · completed on schedule
- Region
- Western Siberia
Per the reference list
Reference list- Facility
- Associated gas power facility: technical solutions for electricity metering
- Role · period
- General contractor · 2024 · completed on schedule
- Region
- Western Siberia
Scope of work
- 01Development of detailed documentation
- 02Technical solutions for an automated commercial electricity metering system
- 03Noise impact calculation
- 04Noise mitigation measures
- 05Development of cost estimate documentation
Highlights
- 100% APG utilisation
- Use of the generated electricity at the field
- Calculation of noise impact on personnel; the standard level is achieved through sound-absorbing measures