Completed project · Urals–Volga region
Field compressor station
Field compressor station
- Re-equipment
- New construction
- Power
- booster compressor station capacity — new construction within technical re-equipment
- 438 million Nm³/year
- unique condensate pumping station
- 4 → 8 MPa
- an autonomous power complex based on gas piston units
- 3.5 MW
Per the reference list
Reference list- Role · period
- Subcontractor · 2022–2023 · completed on schedule
- Region
- Urals–Volga region
Scope of work
- 01Pre-design survey
- 02Development of technical solutions
- 03Engineering surveys
- 04Development of technical re-equipment documentation
- 05Organisation of and support through the industrial safety expert review
Highlights
- New construction of a 438 million Nm³/year booster compressor station within technical re-equipment
- Cooperation with a foreign equipment supplier
- Translation of foreign design documentation
- A unique condensate pumping station: 4 MPa inlet pressure, 8 MPa outlet pressure
- A 3.5 MW stand-alone gas-engine power plant
- Synchronisation of the central grid with the power complex
Similar projects
- Far EastRe-equipment
Re-equipment of a gas treatment unit tank farm
- reagent tank farm capacity
- 4,000 m³
- Feasibility study with cost engineering and implementation options
- Data collection · Pre-design survey
- Western SiberiaPower
Associated gas power facility
- APG utilisation
- 100%
- technical solutions for electricity metering
- AMR
- Western SiberiaRe-equipment
Re-equipment of a gas treatment facility
- pre-design survey at extremely low temperatures
- −57 °C
- production — installation per the construction organisation plan
- No shutdown