Completed project · Urals–Volga region

Field compressor station

Field compressor station

  • Re-equipment
  • New construction
  • Power
booster compressor station capacity — new construction within technical re-equipment
438 million Nm³/year
unique condensate pumping station
4 → 8 MPa
an autonomous power complex based on gas piston units
3.5 MW

Per the reference list

Reference list
Role · period
Subcontractor · 2022–2023 · completed on schedule
Region
Urals–Volga region

Scope of work

  1. 01Pre-design survey
  2. 02Development of technical solutions
  3. 03Engineering surveys
  4. 04Development of technical re-equipment documentation
  5. 05Organisation of and support through the industrial safety expert review

Highlights

  • New construction of a 438 million Nm³/year booster compressor station within technical re-equipment
  • Cooperation with a foreign equipment supplier
  • Translation of foreign design documentation
  • A unique condensate pumping station: 4 MPa inlet pressure, 8 MPa outlet pressure
  • A 3.5 MW stand-alone gas-engine power plant
  • Synchronisation of the central grid with the power complex