Skip to content

Completed project · Western Siberia

Re-equipment of a gas treatment facility

Technical re-equipment of a gas treatment facility

  • Re-equipment
pre-design survey at extremely low temperatures
−57 °C
production — installation per the construction organisation plan
No shutdown

Per the reference list

Reference list
Role · period
General contractor · 2024 · completed on schedule
Region
Western Siberia

Scope of work

  1. 01Input data collection and pre-design survey
  2. 02Detailed documentation for technical re-equipment
  3. 03Organisation of and support through the industrial safety expert review

Highlights

  • Pre-design survey at extremely low temperatures (−57 °C)
  • Redundancy of the turbo-expander units’ process control system
  • Ring redundancy scheme for nitrogen supply to the entire unit
  • Use of existing reserves and networks to minimise capital expenditure
  • The construction organisation plan provides for installation without production shutdown