Completed project · Western Siberia
Re-equipment of a gas treatment facility
Technical re-equipment of a gas treatment facility
- Re-equipment
- pre-design survey at extremely low temperatures
- −57 °C
- production — installation per the construction organisation plan
- No shutdown
Per the reference list
Reference list- Role · period
- General contractor · 2024 · completed on schedule
- Region
- Western Siberia
Scope of work
- 01Input data collection and pre-design survey
- 02Detailed documentation for technical re-equipment
- 03Organisation of and support through the industrial safety expert review
Highlights
- Pre-design survey at extremely low temperatures (−57 °C)
- Redundancy of the turbo-expander units’ process control system
- Ring redundancy scheme for nitrogen supply to the entire unit
- Use of existing reserves and networks to minimise capital expenditure
- The construction organisation plan provides for installation without production shutdown
Similar projects
- Urals–Volga regionRe-equipment · New construction · Power
Field compressor station
- booster compressor station capacity — new construction within technical re-equipment
- 438 million Nm³/year
- unique condensate pumping station
- 4 → 8 MPa
- Far EastRe-equipment
Re-equipment of a gas treatment unit tank farm
- reagent tank farm capacity
- 4,000 m³
- Feasibility study with cost engineering and implementation options
- Data collection · Pre-design survey
- Far EastRe-equipment
Re-equipment of the process control system of a gas treatment facility
- signals designed
- 2800
- drawing sets
- 1720