Skip to content

Completed project · Far East

Re-equipment of a gas treatment unit tank farm

Technical re-equipment of a gas treatment unit tank farm

  • Re-equipment
reagent tank farm capacity
4,000 m³
Feasibility study with cost engineering and implementation options
Data collection · Pre-design survey

Per the reference list

Reference list
Role · period
General contractor · 2023–2024 · completed
Region
Far East

Scope of work

  1. 01Input data collection and pre-design survey
  2. 02Feasibility study including cost engineering and project implementation options at the input data collection and pre-design survey stages
  3. 03Integrated engineering surveys
  4. 04Development of design and detailed documentation
  5. 05Organisation of and support through the industrial safety expert review

Highlights

  • Reagent storage capacity — 4,000 m³
  • Updating outdated requirements for the reagent facilities
  • Reagent receipt, storage and dispensing infrastructure
  • Pump replacement, construction of a tank-truck loading point
  • Odorisation solution
  • Nitrogen blanketing solution