Completed project · Far East
Re-equipment of a gas treatment unit tank farm
Technical re-equipment of a gas treatment unit tank farm
- Re-equipment
- reagent tank farm capacity
- 4,000 m³
- Feasibility study with cost engineering and implementation options
- Data collection · Pre-design survey
Per the reference list
Reference list- Role · period
- General contractor · 2023–2024 · completed
- Region
- Far East
Scope of work
- 01Input data collection and pre-design survey
- 02Feasibility study including cost engineering and project implementation options at the input data collection and pre-design survey stages
- 03Integrated engineering surveys
- 04Development of design and detailed documentation
- 05Organisation of and support through the industrial safety expert review
Highlights
- Reagent storage capacity — 4,000 m³
- Updating outdated requirements for the reagent facilities
- Reagent receipt, storage and dispensing infrastructure
- Pump replacement, construction of a tank-truck loading point
- Odorisation solution
- Nitrogen blanketing solution
Similar projects
- Urals–Volga regionRe-equipment · New construction · Power
Field compressor station
- booster compressor station capacity — new construction within technical re-equipment
- 438 million Nm³/year
- unique condensate pumping station
- 4 → 8 MPa
- Western SiberiaRe-equipment
Re-equipment of a gas treatment facility
- pre-design survey at extremely low temperatures
- −57 °C
- production — installation per the construction organisation plan
- No shutdown
- Far EastRe-equipment
Re-equipment of the process control system of a gas treatment facility
- signals designed
- 2800
- drawing sets
- 1720