Skip to content

Completed project · Far East

Re-equipment of the process control system of a gas treatment facility

Technical re-equipment of the control and emergency shutdown systems of a gas treatment facility

  • Re-equipment
signals designed
2800
drawing sets
1720
of new pipe racks
5 km

Per the reference list

Reference list
Role · period
Subcontractor · 2021–2022 · completed
Region
Far East

Scope of work

  1. 01Pre-design survey
  2. 02Development of technical solutions
  3. 03Engineering surveys
  4. 04Development of technical re-equipment documentation
  5. 05Organisation of and support through the industrial safety expert review

Highlights

  • 3 hazardous production facilities within one production site
  • 30 days in total spent by designers on site
  • 5 km of new pipe racks designed
  • 2,800 signals designed
  • 1,720 drawing sets
  • АК, АТХ, ТХ, КР, ЭС drawing sets
  • Solutions proposed to replace all imported equipment with domestic equipment

The project ran after February 2022: Western DCS and ESD equipment had originally been planned. We analysed the domestic equipment market — manufacturers’ workload, delivery times, payment terms, cost, compatibility with existing Western equipment — and selected the optimal option for the client.