Completed project · Far East
Re-equipment of the process control system of a gas treatment facility
Technical re-equipment of the control and emergency shutdown systems of a gas treatment facility
- Re-equipment
- signals designed
- 2800
- drawing sets
- 1720
- of new pipe racks
- 5 km
Per the reference list
Reference list- Role · period
- Subcontractor · 2021–2022 · completed
- Region
- Far East
Scope of work
- 01Pre-design survey
- 02Development of technical solutions
- 03Engineering surveys
- 04Development of technical re-equipment documentation
- 05Organisation of and support through the industrial safety expert review
Highlights
- 3 hazardous production facilities within one production site
- 30 days in total spent by designers on site
- 5 km of new pipe racks designed
- 2,800 signals designed
- 1,720 drawing sets
- АК, АТХ, ТХ, КР, ЭС drawing sets
- Solutions proposed to replace all imported equipment with domestic equipment
The project ran after February 2022: Western DCS and ESD equipment had originally been planned. We analysed the domestic equipment market — manufacturers’ workload, delivery times, payment terms, cost, compatibility with existing Western equipment — and selected the optimal option for the client.
Similar projects
- Urals–Volga regionRe-equipment · New construction · Power
Field compressor station
- booster compressor station capacity — new construction within technical re-equipment
- 438 million Nm³/year
- unique condensate pumping station
- 4 → 8 MPa
- Far EastRe-equipment
Re-equipment of a gas treatment unit tank farm
- reagent tank farm capacity
- 4,000 m³
- Feasibility study with cost engineering and implementation options
- Data collection · Pre-design survey
- Western SiberiaRe-equipment
Re-equipment of a gas treatment facility
- pre-design survey at extremely low temperatures
- −57 °C
- production — installation per the construction organisation plan
- No shutdown