Completed project · Far East
Unified fire suppression system of a gas field
Technical re-equipment of fire protection systems of a gas field
- Re-equipment
- united by a single fire suppression system
- 4 HPFs
- of cabling
- 39 km
- subsystems fail — the system keeps working
- 3 of 4
Per the reference list
Reference list- Role · period
- Subcontractor · 2021–2022 · completed
- Region
- Far East
Scope of work
- 01Pre-design survey
- 02Development of technical solutions
- 03Engineering surveys
- 04Development of technical re-equipment documentation
- 05Organisation of and support through the industrial safety expert review
Highlights
- A single system instead of the existing separate local fire suppression systems
- 4 hazardous production facilities optimally combined into a single automatic fire-suppression system
- If 3 of 4 subsystems fail, the remaining system keeps functioning
- 39 km of cable designed
- A 3.5 km pipeline
- 3 pumping stations replaced
Similar projects
- Urals–Volga regionRe-equipment · New construction · Power
Field compressor station
- booster compressor station capacity — new construction within technical re-equipment
- 438 million Nm³/year
- unique condensate pumping station
- 4 → 8 MPa
- Far EastRe-equipment
Re-equipment of a gas treatment unit tank farm
- reagent tank farm capacity
- 4,000 m³
- Feasibility study with cost engineering and implementation options
- Data collection · Pre-design survey
- Western SiberiaRe-equipment
Re-equipment of a gas treatment facility
- pre-design survey at extremely low temperatures
- −57 °C
- production — installation per the construction organisation plan
- No shutdown