Completed project · Western Siberia

Switching an oil well to gas production

Well facilities and utility corridor

  • Re-equipment
  • New construction
  • RTP pipelines
and without an HPF safety justification — converting an oil well to a gas well
without STU
pipelines instead of metal
RTP

Per the reference list

Reference list
Role · period
Subcontractor · 2022 · completed
Region
Western Siberia

Scope of work

  1. 01Pre-design survey
  2. 02Development of technical solutions
  3. 03Engineering surveys
  4. 04Technical re-equipment documentation for the well
  5. 05Design and detailed documentation for the utility corridor
  6. 06Organisation of and support through industrial safety and non-state expert reviews

Highlights

  • Conversion of an oil well to a gas well without STU or an HPF safety justification
  • Design of RTP pipelines instead of metal
  • Engineering surveys under autonomous conditions
  • Splitting the project after the technical solutions stage into technical re-equipment and new construction