Completed project · Western Siberia
Switching an oil well to gas production
Well facilities and utility corridor
- Re-equipment
- New construction
- RTP pipelines
- and without an HPF safety justification — converting an oil well to a gas well
- without STU
- pipelines instead of metal
- RTP
Per the reference list
Reference list- Role · period
- Subcontractor · 2022 · completed
- Region
- Western Siberia
Scope of work
- 01Pre-design survey
- 02Development of technical solutions
- 03Engineering surveys
- 04Technical re-equipment documentation for the well
- 05Design and detailed documentation for the utility corridor
- 06Organisation of and support through industrial safety and non-state expert reviews
Highlights
- Conversion of an oil well to a gas well without STU or an HPF safety justification
- Design of RTP pipelines instead of metal
- Engineering surveys under autonomous conditions
- Splitting the project after the technical solutions stage into technical re-equipment and new construction
Similar projects
- Urals–Volga regionRe-equipment · New construction · Power
Field compressor station
- booster compressor station capacity — new construction within technical re-equipment
- 438 million Nm³/year
- unique condensate pumping station
- 4 → 8 MPa
- Far EastRe-equipment
Re-equipment of a gas treatment unit tank farm
- reagent tank farm capacity
- 4,000 m³
- Feasibility study with cost engineering and implementation options
- Data collection · Pre-design survey
- Western SiberiaRe-equipment
Re-equipment of a gas treatment facility
- pre-design survey at extremely low temperatures
- −57 °C
- production — installation per the construction organisation plan
- No shutdown